Defence
Hydro Solutions World Wide Ltd have a proud associaion with the manufacture and supply of harsh environment cable systems to some of the countries lea ding defence contractors.
Just recently HSWL took on the task of supplying 1 x 2250mtrs and 1 x 2300mtrs continuous lengths as part of the replacement power cable running from shore to t he 7N navigation light situated in the Rhu Narrows. The navigation light system helps provide vessels with a safe passage from Faslane Naval base in all weather conditions and hours of darkness.
Hydro Solutions were able to supply both reels faster than all competitors and at a significant cost saving to the end user.

Other products include :
Subsea Fibre Optic cable / connector assembliesRemotely Operated Vehicles (ROV) + Autonomous Underwater Vehicles (AUV)
Towed array cable and connectors
Divers comms cable



